๐ŸŒ Worldwide shipping ยท 30-day returns ยท Rated Excellent on Trustpilot โ˜…โ˜…โ˜…โ˜…ยฝ
Price
$17.99
100M Long Telescopic Teacher Pointer Stick with Hand Lanyard, Teaching Pointer for Classroom, Hand Pointer Extendable Pointer Stick Retractable Pointer Handheld Presenter(Black) โ€” image 1
Presentation PointersVOVIGGOLโœ“ In stock

100M Long Telescopic Teacher Pointer Stick with Hand Lanyard, Teaching Pointer for Classroom, Hand Pointer Extendable Pointer Stick Retractable Pointer Handheld Presenter(Black)

โ˜…โ˜…โ˜…โ˜…โ˜…
$17.99

Options

2 available
Color: Black
Worldwide shipping
Fast tracked delivery
30-day returns
Hassle-free returns
Secure checkout
Safe & protected
Great service
Thousands of happy customers
About this item
  • Telescoping Pointer is professional telescopic electric whiteboard Teaching Pointer & Guide Flagpole, Work on Traditional Blackboard, Electric Whiteboard, PPT, Large Display Screen. It's an ideal teaching tools for school educational or training course instruction.
  • The Portable Pointer Consists of Four Parts -- including a stainless steel rod, a white soft mushroom felt NIB, a high density sponge handle which is soft and non-slip, a cotton lanyard that can be hung on your wrist to prevent it from falling off.
  • Seven Section Shaft Design -- Each section of the pointers for teachers is closely connected, stable and without shaking, and can be flexibly adjusted. (Note: The seven section includes the handle position).
  • Size -- The extension length of the pointing stick is 100cm / 39 inches, the contraction length is 20.5cm / 8.0 inches, and the handle length is 12cm / 4.7inch. The presentation pointer is long enough for most presentation occasions,
  • Wide Applicability โ€“ Telescopic pointer is suitable for teachers, tour guides, coaches, conference training, speeches, conference sandboxes, sales staff, commanders, explainers, etc. It can effectively point out key information when giving lectures or teaching.
Product details
Brand
VOVIGGOL
Manufacturer
calistar
Material
Stainless Steel
Colour
Black
Part number
PB 1
EAN
0752792091864

Customer reviews

What customers say about Bigamart

10 Trustpilot reviews total, with 2 shown at a time.

Trustpilot
โ˜…โ˜…โ˜…โ˜…โ˜…
Excellent
4.5 average rating
See all reviews โ†’
S
Sigalit
๐Ÿ‡ฎ๐Ÿ‡ฑ ยท January 2026
โ˜…โ˜…โ˜…โ˜…โ˜…

I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.

V
Verified buyer
๐Ÿ‡ฆ๐Ÿ‡บ ยท November 2025
โ˜…โ˜…โ˜…โ˜…โ˜…

The package was here in Australia from England in a few days โ€” so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.

Showing 1โ€“2 of 10 reviews

You might also like

Similar items

View all โ†’