

20pcs Electrolytic Capacitor, 450V 22uf Long Leads Axial Electrolytic Polarized Capacitors Tube Amplifier
About this item
- [Stable Performance] -- High quality electrolytic capacitors with stable performance.
- [Specification] -- Working Voltage: DC 450V; Surge voltage: DC 500V; Value: 22uf; Capacitance Tolerance: ยฑ20%; Operating temperature: 105; Dissipation Factor:
- [Durable &Long Life] -- Heat resisting, low leakage, low loss and low impedance.
- [Ideal Choice] -- Great choice for electronic professionals or enthusiasts.
- [WIde Used] -- Suitable for a wide range of electronic applications.
Product description
Features: High quality electrolytic capacitors with stable performance. The specifications of the capacitors is marked on its surface, convenient to use. Heat resisting, low leakage, low loss and low impedance. Great choice for electronic professionals or enthusiasts. Suitable for a wide range of electronic applications. Specifications: Working Voltage: DC 450V Surge voltage: DC 500V Value: 22uf Capacitance Tolerance: ยฑ20% Operating temperature: 105โ Dissipation Factor: <0.24 at 20โ/120Hz Dimensions: 16 x 27mm / 0.63 x 1.06inch Lead type length: Tin plating copper layer Lead length: 38mm / 1.5inch Type: Polarized Quantity: 20pcs Weight: Approx. 79g Package Included: 20 x Electrolytic Capacitor
Product details
Customer reviews
What customers say about Bigamart
10 Trustpilot reviews total, with 2 shown at a time.
I wrote to Bigamart's customer support and they accompanied the process of reshipping the item until it finally arrived. I felt a genuine effort to solve the problem till it was finally solved.
The package was here in Australia from England in a few days โ so quick! Something was missing and they refunded it straight away. Pretty happy with these guys.
You might also like
Similar items


Paxanpax PLD050 Universal Capacitor 16uF / 16MFD, 450VAC 18cm Cable


